Title :
Integration of DG in MV-grids challenges encountered by the grid operator
Author :
Houwelingen, Dik van ; Coster, Edward
Author_Institution :
Stedin, Netherlands
fYear :
2009
fDate :
8-11 June 2009
Firstpage :
1
Lastpage :
1
Abstract :
A major part of decentralised production in the Netherlands consists of Combined Heat and Power-plants (CHP). Especially in the horticultural sector small CHP-plants with a maximum rating of 2,5 MW are applied. In these areas the CHP-plants are connected to the Medium voltage grid which leads to a high penetration level of CHP-plants. The Dutch law obliges grid operators to connect CHP-plants to the grid in 18 weeks, and prohibits long term transportation restrictions. When dealing with multiple CHP-connection in a grid the legal obligations conflict with planning permissions and project times. The presentation describes a scenario based method, which enables Stedin to plan the grid expansion pro-actively. In the presentation the results of the case study in the Oostland area are presented.
fLanguage :
English
Publisher :
iet
Conference_Titel :
Electricity Distribution - Part 2, 2009. CIRED 2009. The 20th International Conference and Exhibition on
Conference_Location :
Prague, Czech Republic
Print_ISBN :
978-1-84919-160-9
Type :
conf
Filename :
5371243
Link To Document :
بازگشت