    Solutions for improving maintenance operations on power transformers in primary substations

  • Author

    Mauri, F. ; Cheli, S.

  • Author_Institution
    ENEL Distribuzione S.p.A., Rome, Italy
  • fYear
    2009
  • fDate
    8-11 June 2009
  • Firstpage
    1
  • Lastpage
    1
  • Abstract
    The maintenance of apparatus operating on the electrical networks can be improved following the total cost evaluation approach. Power transformers to be installed in primary substations - typical ratings: 40 MVA, 150 kV/20 kV - have been implemented taking into account the maintenance operations to be performed in all their expected life. This paper describes the main improvements that have been adopted or that are going to be adopted on transformers and relevant accessories in Enel Distribuzione. Moreover economical evaluations, quality of energy supply implications as well as safety and environmental considerations are reported.
  • Keywords
    maintenance engineering; power transformers; substations; Enel Distribuzione; apparent power 40 MVA; economical evaluations; electrical networks; energy supply implication quality; environmental consideration; maintenance operations; power transformers; primary substations; safety consideration; voltage 150 kV; voltage 20 kV;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electricity Distribution - Part 2, 2009. CIRED 2009. The 20th International Conference and Exhibition on
  • Conference_Location
    Prague
  • Print_ISBN
    978-1-84919-160-9
  • Type

    conf

  • Filename
    5371299