• DocumentCode
    509752
  • Title

    New solutions in edp distribuição medium voltage overhead lines

  • Author

    Cardoso, Jose

  • Author_Institution
    EDP Distribui????o, Portugal
  • fYear
    2009
  • fDate
    8-11 June 2009
  • Firstpage
    1
  • Lastpage
    1
  • Abstract
    In the last times, Distribution System Operators (DSO) have felt an increasing pressure to give a better and better answer to health and environmental concerns and to improve the electricity supply quality and network reliability. This pressure has stimulated DSO to find new solutions, namely to networks with overhead lines, networks exposed to a large amount of quality and reliability inhibitors. EDP D., following the innovation way, has been looking for better answer to these challenges, studying and analyzing several different technologies. In this context, EDP D. decided to implement a pilot, building a new and small 15 kV network with spacer cable system, a compact network system of covered conductors from Hendrix Wire & Cable.
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electricity Distribution - Part 2, 2009. CIRED 2009. The 20th International Conference and Exhibition on
  • Conference_Location
    Prague, Czech Republic
  • Print_ISBN
    978-1-84919-160-9
  • Type

    conf

  • Filename
    5371309