DocumentCode
518981
Title
On Minimum Duration Project Schedule
Author
Xie, Fanrong ; Jia, Renan ; Zeng, Guangxing
Author_Institution
Dept. of Math., Nanchang Univ., Nanchang, China
fYear
2010
fDate
11-13 May 2010
Firstpage
436
Lastpage
444
Abstract
In order to facilitate building decision support system relative to project crashing, Minimum Duration Project Schedule Problem (MDPSP) is worthy of further research as a case of project crashing. In this paper, MDPSP is formulated using a bi-level programming model, and an algorithm named mfmc-A is presented to find maximum flow & minimum cut set in network with lower & upper arc capacities. Based on mfmc-A and the algorithm presented by Kamburowski for finding minimum cost project schedule, an algorithm named MDPS-A is proposed to solve MDPSP. The theory, on which MDPS-A is based, is presented. MDPS-A not only can find the optimal solution to MDPSP, but also has a good performance in the sense of being implemented on computer, computational time and required memory for computation. Numerical experiments demonstrate that MDPS-A is an efficient and robust method to solve MDPSP, and especially applicable to larger and more complex project.
Keywords
decision support systems; directed graphs; optimisation; project management; scheduling; MDPS-A algorithm; bi-level programming model; decision support system; mfmc-A algorithm; minimum duration project schedule problem; project crashing; Computer crashes; Costs; Decision support systems; Mathematics; Microcomputers; Processor scheduling; Robustness; Scheduling algorithm; Systems engineering and theory; Visual BASIC; maximum flow; minimum cut set; project crashing;
fLanguage
English
Publisher
ieee
Conference_Titel
New Trends in Information Science and Service Science (NISS), 2010 4th International Conference on
Conference_Location
Gyeongju
Print_ISBN
978-1-4244-6982-6
Electronic_ISBN
978-89-88678-17-6
Type
conf
Filename
5488578
Link To Document