Electrical LNG: Main issues during the multi-MW compressor call for tender clarifications
Author
Bué, Denis
Author_Institution
Total Tour Coupole, La Défense, France
fYear
2010
fDate
15-17 June 2010
Firstpage
1
Lastpage
7
Abstract
This paper presents a brief summary of the advantages of Electrical LNG, with a detailed analysis of the selection criteria for multi-MW (>30MW) electrical drive and its related major equipment (Transformer, VSD and Harmonic Filter) during the call for tender process. The paper will look at the aspects of equipment characteristics, and operating & functional requirements, simulation analysis, shaft study, starting conditions, cooling systems, container versus buildings, preliminary harmonic study, etc. and also look at the interface coordination between the electrical and mechanical team including interfaces between compressor and motor manufacturer in order to provide clear recommendations to the project engineer on the electrical equipment.
Keywords
compressors; natural gas technology; power transformers; shafts; electrical LNG; electrical equipment; gas liquefaction; harmonic filter; multiMW compressor call; project engineer; shaft; transformer; Analytical models; Containers; Cooling; Harmonic analysis; Harmonic filters; Liquefied natural gas; Power harmonic filters; Pulp manufacturing; Shafts; Virtual manufacturing; Electrical LNG; VSD Multimegawatt driver; clarification from bidder proposal;
fLanguage
English
Publisher
ieee
Conference_Titel
PCIC Europe 2010 Conference Record
Conference_Location
Oslo
ISSN
2151-7665
Print_ISBN
978-1-4244-6968-0
Electronic_ISBN
2151-7665
Type
conf
Filename
5525733
Link To Document