    Modeling risk factors dependence using Copula method for assessing software schedule risk

  • Author

    Wu, Dengsheng ; Song, Hao ; Li, Minglu ; Cai, Chen ; Li, Jianping

  • fYear
    2010
  • fDate
    23-25 June 2010
  • Firstpage
    571
  • Lastpage
    574
  • Abstract
    Based on risk factor method, a model for building dependence among risk factors is discussed for assessing schedule risk of software project. Three main risk factors which influence software schedule are described. Copula method is used to model the dependence among risk factor, and Monte Carlo method is adopted to simulate the schedule risk model. The empirical results from a Communication Corporation show that schedule risk of the new software project is overestimated without modeling the dependence among risk factors. Moreover, the model with considering risk factor dependence by Copula can assess the schedule risk accurately.
  • Keywords
    Monte Carlo methods; project management; risk management; scheduling; software engineering; Copula method; Monte Carlo method; risk factors dependence modeling; software project; software schedule risk assessment; Costs; Programming; Project management; Risk analysis; Risk management; Scheduling; Software development management; Software quality; Time factors; Uncertainty; Copula; Risk Dependence; Software Risk Management; Trustworthy Software;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Software Engineering and Data Mining (SEDM), 2010 2nd International Conference on
  • Conference_Location
    Chengdu
  • Print_ISBN
    978-1-4244-7324-3
  • Electronic_ISBN
    978-89-88678-22-0
  • Type

    conf

  • Filename
    5542857