DocumentCode :
531893
Title :
Notice of Retraction
Multi-layer production plan model and system for shipbuilding enterprise
Author :
Chu Dian-hui ; Yu Xiao-guang ; Nie Lan-shun ; Xu Yong-Dong
Author_Institution :
Sch. of Comput. Sci. & Technol., Harbin Inst. of Technol. at Weihai, Weihai, China
Volume :
1
fYear :
2010
fDate :
22-24 Oct. 2010
Abstract :
Notice of Retraction

After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.

We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.

The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.

Shipbuilding enterprise is one of pillar industries of the state, but researches on its production plan and control are rare, thus leads to its low efficiency. So this paper proposes a multilayer production plan model, a task management model based on WBS package and a multilayer resource management model for shipbuilding enterprise. Further more a management system was developed and its success proofed the correctness and effectiveness of the models.
Keywords :
production control; production planning; resource allocation; shipbuilding industry; multilayer production plan model; multilayer resource management model; production control; shipbuilding enterprise; task management model; work breakdown structure; Force; Welding; Multilayer Production Plan Model; Project management; Shipbuilding Enterprise;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Computer Application and System Modeling (ICCASM), 2010 International Conference on
Conference_Location :
Taiyuan
Print_ISBN :
978-1-4244-7235-2
Type :
conf
DOI :
10.1109/ICCASM.2010.5619100
Filename :
5619100
Link To Document :
بازگشت