DocumentCode :
533041
Title :
Application research of SOFM in building project cost
Author :
Guang-Li, Feng ; Wen-Juan, Zhu
Author_Institution :
Sch. of Comput. Sci. & Technol., Henan Inst. of Eng., Zhengzhou, China
Volume :
10
fYear :
2010
fDate :
22-24 Oct. 2010
Abstract :
Currently, the errors in estimation method of the construction project cost lead to the phenomena of “budgetary estimate over estimate, budget over budgetary estimate and final accounts over budget”, which perplexes the investment profits of construction project. To solve the problem, this paper makes a study on the construction project cost by using SOFM neural network, establishes SOFM network model and verifies its feasibility based on the calculations and analysis of experimental data.
Keywords :
budgeting; construction industry; costing; financial data processing; investment; profitability; project management; self-organising feature maps; SOFM neural network; budgetary estimate; building project cost; estimation method; investment profits; Aluminum; Artificial neural networks; Concrete; Organizing; Steel; SOFM; building construction; feature; neural network; project cost estimation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Computer Application and System Modeling (ICCASM), 2010 International Conference on
Conference_Location :
Taiyuan
Print_ISBN :
978-1-4244-7235-2
Electronic_ISBN :
978-1-4244-7237-6
Type :
conf
DOI :
10.1109/ICCASM.2010.5622725
Filename :
5622725
Link To Document :
بازگشت