DocumentCode
536627
Title
Research on Construction Method of Critical and Important Engineering during Lu Mountain Bridge Construction
Author
Song, XinSheng ; Liu, Dongxia
Author_Institution
Transp. Eng. Dept., Henan Univ. of Urban Constr., Pingdingshan, China
fYear
2010
fDate
7-9 Nov. 2010
Firstpage
1
Lastpage
4
Abstract
Cable stayed bridge is one of the chief types of modern long-span bridges. With increasing span length and structure complexity, the research of cable-stayed bridge´s construction control technology is becoming more and more important. Critical and important engineering of Lu Mountain Bridge which is a pre-stress concrete continuous box beam bridge include: bored pile construction under unfavorable geology, mass concrete construction of main tower and pier, construction of beam and stay cable. Critical and important engineering of Lu Mountain Bridge was researched referring to the practice of construction of Lu Mountain Bridge.
Keywords
bridges (structures); cables (mechanical); concrete; construction; foundations; geotechnical engineering; structural engineering; Lu Mountain bridge construction; bored pile construction; cable stayed bridge; critical engineering; important engineering; main tower; mass concrete construction; modern long-span bridges; pier; prestress concrete continuous box beam bridge; structure complexity; unfavorable geology; Bridges; Casting; Concrete; Drilling; Poles and towers; Steel; Structural beams;
fLanguage
English
Publisher
ieee
Conference_Titel
E-Product E-Service and E-Entertainment (ICEEE), 2010 International Conference on
Conference_Location
Henan
Print_ISBN
978-1-4244-7159-1
Type
conf
DOI
10.1109/ICEEE.2010.5660357
Filename
5660357
Link To Document