DocumentCode :
537220
Title :
Research on Variation of ORP on Operation Period of SBBR One-Stage Completely Autotrophic Nitrogen Removal System
Author :
Fang, Fang ; Wei Hong-huai ; Guo Jin-song ; Guo Dong-ru ; Dong Li
Author_Institution :
Key Lab. of the Three Gorges Reservoir Region´´s Eco-Environ., Chongqing Univ., Chongqing, China
fYear :
2010
fDate :
7-9 Nov. 2010
Firstpage :
1
Lastpage :
4
Abstract :
To explore the feasibility of ORP as the control parameter of one-stage completely autotrophic nitrogen removal system, this test studied the synthetic low C/N waste water, analyzed the correlation between the variation rule of concentration of ORP and the transfer of nitrogen compounds in system under different concentrations of DO. Results indicated that the ORP curve emerged a turning point when transfer of ammonium finished under the conditions of DO concentrations were 2.0 mg/L and 1.5mg/L respectively, later the rise speed slowed down, at this point TN removal rates were 69.7% and 81.1% respectively in the system; there was no feature points when DO concentrations were 1.0 mg/L, because ammonia has not been completely transformed in a reaction cycle. Test under different concentrations of DO verified further the reproducibility of characteristic points of ORP, revealing that ORP can serve as the control points to judge completion of the transfer of ammonium consequently stopping aeration.
Keywords :
biochemistry; chemical engineering; nitrogen; wastewater treatment; ORP; SBBR one stage completely autotrophic nitrogen removal system; aeration; ammonia; operation period; synthetic low C/N waste water; Biology; Inductors; Monitoring; Nitrogen; Oxidation; Process control; Wastewater;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
E-Product E-Service and E-Entertainment (ICEEE), 2010 International Conference on
Conference_Location :
Henan
Print_ISBN :
978-1-4244-7159-1
Type :
conf
DOI :
10.1109/ICEEE.2010.5661169
Filename :
5661169
Link To Document :
بازگشت