DocumentCode :
537240
Title :
Study on the Key Technologies of MRP II for Beijing-Shanghai High-Speed Railway Rail Slab Factory
Author :
Jianbin Chi ; Huali Lu ; Guizhen Feng
Author_Institution :
Sch. of Mech. Eng., Shijiazhuang Tiedao Univ., Shijiazhuang, China
fYear :
2010
fDate :
7-9 Nov. 2010
Firstpage :
1
Lastpage :
4
Abstract :
According to the needs of high-speed rail slab factory manufacturing resources management, analyzing the features of the rail slab production and the problems encountered in the process of implementing the MRPII system from applicable aspect, system requirements of the rail slab factory implementing MRPII and key technologies of developing the system are put forward, which include the design of rough slabs master production scheduling, rail slab storage area view management, rail slab archives management and so on.
Keywords :
railways; Beijing-Shanghai high speed railway rail slab factory; MRP II key technologies; manufacturing resources management; Educational institutions; Mechanical engineering; Planning; Production facilities; Rails; Slabs;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
E-Product E-Service and E-Entertainment (ICEEE), 2010 International Conference on
Conference_Location :
Henan
Print_ISBN :
978-1-4244-7159-1
Type :
conf
DOI :
10.1109/ICEEE.2010.5661193
Filename :
5661193
Link To Document :
بازگشت