DocumentCode :
537947
Title :
The verification of during the challenge for railway signaling systems
Author :
Jeong, Rag-Gyo ; Kim, Beak-Hyeon ; Koo, Ja-Sung
Author_Institution :
Signaling & Electr. Eng. Res. Dept., Korea Railroad Res. Inst. (KRRI), Uiwang, South Korea
fYear :
2010
fDate :
10-13 Oct. 2010
Firstpage :
1996
Lastpage :
1999
Abstract :
Until now, in railway signaling system the conventional wayside signal mode has been used generally. There are, however, the risk of accidents such as human mistakes caused by that the driver identifies the signal lamp status and controls train speed with the naked eye. It is also necessary to refurbish the obsolete system. Thereby, it is being effective that the onboard signal mode has been recently introduced and applied in order to transmit the speed control information to train by using the computer and communication equipment. It is necessary to switch over the system in a way while providing passengers with an operation service to replace the obsolete signal system. In this paper, Will be verify the cases through trial assessment which are solved by the way of adding specific functionalities(TODS) in the problems of interference among the procedure of switch-over processes and a serial of processes for system verification while a train is operated in the new system in parallel to the existing system.
Keywords :
railway engineering; velocity control; communication equipment; obsolete signal system; railway signaling system; signal lamp status; switch over process; train speed control;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electrical Machines and Systems (ICEMS), 2010 International Conference on
Conference_Location :
Incheon
Print_ISBN :
978-1-4244-7720-3
Type :
conf
Filename :
5664048
Link To Document :
بازگشت