DocumentCode :
538661
Title :
A Simulation Study on the Walking Hydraulic System for Tracked Nodule Collector for Sea Floor Mining on the Basis of AMESim Platform
Author :
Zeng Yihui ; Liu Shaojun ; Zhang Xiaojian
Author_Institution :
Sch. of Mech. & Electr. Eng., Central South Univ., Changsha, China
Volume :
1
fYear :
2010
fDate :
18-20 Dec. 2010
Firstpage :
121
Lastpage :
126
Abstract :
The tracked nodule collector for sea floor mining is one of the key technologies for a deep-sea polymetallic nodule mining system, this paper builds a simulation model of walking hydraulic system for a tracked nodule collector on the basis of AMESim platform, a closed loop control system is constituted in the paper according to the negative feedback of the hydraulic motor angular velocity, a stimulation analysis is also made on the response characteristics of pedrail speed and motor pressure. Through the comparative study between the results of experiment and simulation, this paper verifies the validity of modeling a walking hydraulic system for tracked nodule collector for sea floor mining, manifesting that the created walking hydraulic system meets the demand of China´s polymetallic nodule mining system on benthal tracked nodule collector.
Keywords :
closed loop systems; digital simulation; hydraulic systems; mining; three-term control; AMESim platform; closed loop control system; deep-sea polymetallic nodule mining system; hydraulic motor angular velocity; negative feedback control systems; sea floor mining; tracked nodule collector; walking hydraulic system; AMESim; PID control; benthal tracked nodule collector; hydraulic system; simulation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Digital Manufacturing and Automation (ICDMA), 2010 International Conference on
Conference_Location :
ChangSha
Print_ISBN :
978-0-7695-4286-7
Type :
conf
DOI :
10.1109/ICDMA.2010.25
Filename :
5701114
Link To Document :
بازگشت