A thermal constraint study of the Wellington regional transmission network
Author
Paranavithana, Prabodha ; Phoon, Jin
Author_Institution
Grid Dev., Transpower New Zealand Ltd., Wellington, New Zealand
fYear
2010
fDate
5-8 Dec. 2010
Firstpage
1
Lastpage
5
Abstract
The 2010 Annual Planning Report (APR) of Transpower New Zealand, the owner and operator of the New Zealand (NZ) grid, has indicated a capacity issue in the Wellington 110 kV load area particularly after standing down the inter-island HVDC Pole 1 in late 2007. Presently, the HVDC link is coupled with the Wellington 220 kV AC network, and thus the capacity into the 110 kV load area is dependent on the HVDC transfer level and its direction. This paper presents a study carried out to identify this capacity issue, and to investigate the preferred corrective measure. The analysis covers the system under normal conditions, and under various contingency situations.
Keywords
power grids; power transmission planning; AC network; HVDC link; HVDC transfer level; New Zealand grid; Wellington regional transmission network; interisland HVDC Pole 1; thermal constraint; voltage 110 kV; voltage 220 kV; HVDC transmission; Impedance; Investments; Limiting; Roads; Security; Substations; HVDC; credible contingency events; thermal constraints; transmission;
fLanguage
English
Publisher
ieee
Conference_Titel
Universities Power Engineering Conference (AUPEC), 2010 20th Australasian
Conference_Location
Christchurch
Print_ISBN
978-1-4244-8379-2
Electronic_ISBN
978-1-4244-8380-8
Type
conf
Filename
5710800
Link To Document