• DocumentCode
    539363
  • Title

    Impacts of small lot manufacturing on AMHS

  • Author

    Kondo, Hiroshi

  • Author_Institution
    Asyst Technologies Japan, Inc., Ise-city, Mie prif., Japan
  • fYear
    2008
  • fDate
    27-29 Oct. 2008
  • Firstpage
    93
  • Lastpage
    96
  • Abstract
    Demands to reduce semiconductor fab lot cycle time are increasing more and more. Small lot manufacturing (SLM) is proposed as a promising way to reduce cycle times considerably. However there are detractors against realizing effective SLM. Some of them are related to Automated Manufacturing Handling System (AMHS). This paper describes these detractors and discuss potential solutions for them. We conclude that AMHS solutions for SLM should stress more transport capacity and shorter Carrier Exchange Time (CET) rather than shorter delivery time. We also conclude that mathematical models are more intuitive and useful than simulation models for such studies.
  • Keywords
    Approximation methods; Manufacturing; Markov processes; Mathematical model; Probability; Production facilities; Stress;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Semiconductor Manufacturing (ISSM), 2008 International Symposium on
  • Conference_Location
    Tokyo, Japan
  • ISSN
    1523-553X
  • Electronic_ISBN
    1523-553X
  • Type

    conf

  • Filename
    5714880