DocumentCode
539363
Title
Impacts of small lot manufacturing on AMHS
Author
Kondo, Hiroshi
Author_Institution
Asyst Technologies Japan, Inc., Ise-city, Mie prif., Japan
fYear
2008
fDate
27-29 Oct. 2008
Firstpage
93
Lastpage
96
Abstract
Demands to reduce semiconductor fab lot cycle time are increasing more and more. Small lot manufacturing (SLM) is proposed as a promising way to reduce cycle times considerably. However there are detractors against realizing effective SLM. Some of them are related to Automated Manufacturing Handling System (AMHS). This paper describes these detractors and discuss potential solutions for them. We conclude that AMHS solutions for SLM should stress more transport capacity and shorter Carrier Exchange Time (CET) rather than shorter delivery time. We also conclude that mathematical models are more intuitive and useful than simulation models for such studies.
Keywords
Approximation methods; Manufacturing; Markov processes; Mathematical model; Probability; Production facilities; Stress;
fLanguage
English
Publisher
ieee
Conference_Titel
Semiconductor Manufacturing (ISSM), 2008 International Symposium on
Conference_Location
Tokyo, Japan
ISSN
1523-553X
Electronic_ISBN
1523-553X
Type
conf
Filename
5714880
Link To Document