DocumentCode :
539364
Title :
Timed Move Command for improved on-time AMHS delivery
Author :
Lübke, Jörg ; Honold, Alfred
Author_Institution :
AMD Fab 36 LLC & Co. KG, Dresden, Germany
fYear :
2008
fDate :
27-29 Oct. 2008
Firstpage :
89
Lastpage :
92
Abstract :
This paper introduces the concept of Timed Move Command used in the AMHS Control System as a method to meet on-time delivery requirements of equipment in a modern 300 mm fab. It describes how the implementation of Timed Move Commands can ensure on-time delivery of wafers to equipment operated with 12 wafers per lot without the use of costly equipment buffers or an increased number of load ports. Several operational scenarios are presented for equipment which has a CET budget as small as 3 minutes. The paper discusses also the resulting AMHS requirements.
Keywords :
Cooling; Delay; Materials; Tracking; Vehicles;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Semiconductor Manufacturing (ISSM), 2008 International Symposium on
Conference_Location :
Tokyo, Japan
ISSN :
1523-553X
Electronic_ISBN :
1523-553X
Type :
conf
Filename :
5714881
Link To Document :
بازگشت