DocumentCode
539364
Title
Timed Move Command for improved on-time AMHS delivery
Author
Lübke, Jörg ; Honold, Alfred
Author_Institution
AMD Fab 36 LLC & Co. KG, Dresden, Germany
fYear
2008
fDate
27-29 Oct. 2008
Firstpage
89
Lastpage
92
Abstract
This paper introduces the concept of Timed Move Command used in the AMHS Control System as a method to meet on-time delivery requirements of equipment in a modern 300 mm fab. It describes how the implementation of Timed Move Commands can ensure on-time delivery of wafers to equipment operated with 12 wafers per lot without the use of costly equipment buffers or an increased number of load ports. Several operational scenarios are presented for equipment which has a CET budget as small as 3 minutes. The paper discusses also the resulting AMHS requirements.
Keywords
Cooling; Delay; Materials; Tracking; Vehicles;
fLanguage
English
Publisher
ieee
Conference_Titel
Semiconductor Manufacturing (ISSM), 2008 International Symposium on
Conference_Location
Tokyo, Japan
ISSN
1523-553X
Electronic_ISBN
1523-553X
Type
conf
Filename
5714881
Link To Document