• DocumentCode
    539378
  • Title

    TAT cost calculation of a wafer in a lot

  • Author

    Okumura, Hiroyuki

  • Author_Institution
    NEC Electronics Corporation, Sagamihara, Kanagawa, Japan
  • fYear
    2008
  • fDate
    27-29 Oct. 2008
  • Firstpage
    149
  • Lastpage
    151
  • Abstract
    TAT cost standard is defined and proposed by a relation between lot size, TAT and wafer cost in this paper. How to treat large variations of waiting time in a site data is excogitated. Proposed TAT costs equations and corrections can be used in a short TAT rate charge, TAT management etc. of many lines and products.
  • Keywords
    Equations; Least squares approximation; Manufacturing; Materials; Mathematical model; Productivity;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Semiconductor Manufacturing (ISSM), 2008 International Symposium on
  • Conference_Location
    Tokyo, Japan
  • ISSN
    1523-553X
  • Electronic_ISBN
    1523-553X
  • Type

    conf

  • Filename
    5714899