Title : 
Energy Saving Analysis of Air-conditioning System of an Existing Office Buildings in Shanghai
         
        
            Author : 
Xing, Han ; Kehua, Ma ; Beihong, Zhang
         
        
            Author_Institution : 
DHV Eng. Consultancy (Shanghai) Co, Shanghai, China
         
        
        
        
        
        
        
            Abstract : 
According to the present problems of existing office buildings using air source heat pump, countermeasures were brought forward to solve the problems, such as changing part of the present air source heat pumps to water-cooled cold water units, changing present units into new air source heat pumps and pump variable frequency renovation. According to the case study in this paper, the static return period are 2years, 5-7years and 1-4years for each measure.
         
        
            Keywords : 
air conditioning; heat pumps; Shanghai; air conditioning system; air source heat pump; energy saving analysis; office building; pump variable frequency renovation; water cooled cold water; Buildings; Cooling; Energy consumption; Energy measurement; Heat pumps; Lighting; Water heating; Air source heat pump; Energy conservation renovation measure; Energy saving; Office building;
         
        
        
        
            Conference_Titel : 
Measuring Technology and Mechatronics Automation (ICMTMA), 2011 Third International Conference on
         
        
            Conference_Location : 
Shangshai
         
        
            Print_ISBN : 
978-1-4244-9010-3
         
        
        
            DOI : 
10.1109/ICMTMA.2011.299