    The transmission network expansion planning model under interval load is built. This model considers the load uncertainty. Its objective is the minimum of investment and its constraints are the network safety under both normal and NȒ1 conditions. The interval minimum load cutting theory is used and the interval maximum load cutting number is calculated to judge the safety of transmission expansion planning scheme under interval load. The greedy randomized adaptive search procedure algorithm (GRASP) is used to solve the model. The 6-bus and 77-bus system cases prove the rightness and validity of the method proposed in this paper.
  • Keywords
    power transmission planning; search problems; 6-bus system; 77-bus system; greedy randomized adaptive search procedure algorithm; interval maximum load cutting number; interval minimum load cutting theory; load uncertainty; network safety; transmission network expansion planning; Adaptation model; Investments; Load modeling; Mathematical model; Planning; Safety; Sensitivity; greedy randomized adaptive search procedure; interval load; interval maximum load cutting theory; transmission network expansion planning;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electricity Distribution (CICED), 2010 China International Conference on
  • Conference_Location
    Nanjing
  • Print_ISBN
    978-1-4577-0066-8
  • Type

    conf

  • Filename
    5735977