• DocumentCode
    541416
  • Title

    Application of IEC 61850 proxy in seamless communication between digital substation and control centre

  • Author

    Chen Ailin ; Dai ZeMei ; Ding Jie ; Huang Haifeng ; Wang Yan ; He Ming-yi

  • Author_Institution
    State Grid Electr. Power Res. Inst., Nanjing, China
  • fYear
    2010
  • fDate
    13-16 Sept. 2010
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    The paper deals with application requirements of seamless communication between digital substation and control centre, especially model harmonization between IEC 61850 and 61970. The necessity and feasibility of IEC 61850 proxy acting as a communication server in substation is introduced. It also describes the proxy software design of functions and architecture. The proxy makes full consideration of IEC 61850 and 61970 application technologies, such as modeling methods, configuration tool, real-time database, IEC 61850 ACSI client, services mapping, access security, maintenance and hardware. The proxy features prefect functions, simple configuration and easy maintenance, and will become an important front-end communication device in future construction of smart substation, providing technological support for seamless connections between heterogeneous systems in smart grid.
  • Keywords
    IEC standards; network servers; substation automation; IEC 61850 proxy; communication server; control centre; digital substation; front-end communication; model harmonization; proxy acting; seamless communication; Biological system modeling; Companies; Computer integrated manufacturing; IEC standards; Monitoring; Resource description framework; Servers; IEC 61850; IEC 61970; model harmonization; proxy server; seamless communication;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electricity Distribution (CICED), 2010 China International Conference on
  • Conference_Location
    Nanjing
  • Print_ISBN
    978-1-4577-0066-8
  • Type

    conf

  • Filename
    5736131