DocumentCode :
54802
Title :
Upgrades of the ALICE TPC Front-End Electronics for Long Shutdown 1 and 2
Author :
Velure, Arild
Author_Institution :
Dept. of Phys. & Technol., Univ. of Bergen, Bergen, Norway
Volume :
62
Issue :
3
fYear :
2015
fDate :
Jun-15
Firstpage :
1040
Lastpage :
1044
Abstract :
This paper presents the front-end electronics upgrades of the ALICE Time Projection Chamber detector for the coming years, with a focus on the upgrades for Long Shutdown 2. The Large Hadron Collider is currently in Long Shutdown 1 following a successful first run, and upgrades of the detectors are underway to support the higher particle interaction rates planned for the next run. For the Time Projection Chamber, the increase in data due to the higher interaction rate and higher energy will cause a bottleneck in the Readout Control Unit and a new board is in development which increases the data-link speed to the back-end. Another more general upgrade of the ALICE experiment is planned for Long Shutdown 2, foreseen to start in 2018. In this case the goal is to cope with an even higher interaction rate of 50 kHz for Pb-Pb collisions. The present Multi Wire Proportional Chambers of the Time Projection Chamber will then be replaced by Gas Electron Multiplier technology. At the same time, the front-end electronics and readout system will also be replaced.
Keywords :
electron multiplier detectors; elementary particle inclusive interactions; nuclear electronics; readout electronics; time projection chambers; AD 2018; ALICE TPC front-end electronics upgrades; ALICE Time Projection Chamber detector; Gas Electron Multiplier technology; Large Hadron Collider; Long Shutdown 1; Long Shutdown 2; Multi Wire Proportional Chambers; Pb-Pb collisions; Readout Control Unit; data-link speed; detector upgrades; frequency 50 kHz; higher particle interaction rates; readout system; Application specific integrated circuits; Data acquisition; Detectors; Field programmable gate arrays; Large Hadron Collider; Readout electronics; Wires; Detector instrumentation; GEM detectors; front-end electronics; frontend systems; mixed signal circuits; particle detectors; readout electronics; real time systems; time projection chambers;
fLanguage :
English
Journal_Title :
Nuclear Science, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9499
Type :
jour
DOI :
10.1109/TNS.2014.2382332
Filename :
7031978
Link To Document :
بازگشت