DocumentCode
551941
Title
System architecture for work load management of postal delivery operation
Author
Park, Jeong-Hyun ; Park, Jong-Heung
Author_Institution
Postal Logistics Technol. Res. Dept., Electron. & Telecommun. Res. Inst. ETRI, Daejeon, South Korea
fYear
2011
fDate
16-18 Aug. 2011
Firstpage
200
Lastpage
204
Abstract
This paper presents work load factors and management system of postal delivery operation. The proposed work load factors and management for postal delivery operation which consists of delivery sequence sorting, moving, mail delivery, and additional work for mail delivery is based on the number of delivery mail, a kind of mail, moving and delivery environments such as APT, Villa, house area, school/hospital/public building/commercial& business area, and complex building & officetel area. There is also system architecture and user interface for work load management of postal delivery operation which is based on the proposed model in this paper. The management system will be adapted for more relational and efficient work load management of postal delivery operation.
Keywords
electronic mail; logistics data processing; postal services; user interface management systems; delivery mail; postal delivery operation; system architecture; user interface; work load management; Buildings; Educational institutions; Electronic mail; Load management; Postal services; Sorting; User interfaces; Postal Delivery Operation; Postal Logistics; Work Load Measurement;
fLanguage
English
Publisher
ieee
Conference_Titel
Interaction Sciences (ICIS), 2011 4th International Conference on
Conference_Location
Busan
Print_ISBN
978-1-4577-0480-2
Electronic_ISBN
978-89-88678-45-9
Type
conf
Filename
6014559
Link To Document