• DocumentCode
    555668
  • Title

    Study on activity-based cost estimation of steel enterprise

  • Author

    Wang, Ya-jun ; Yang, Ji-xin ; Shi, Jun-li

  • Author_Institution
    Sch. of Mech. Eng., Dalian Polytech. Univ., Dalian, China
  • Volume
    Part 2
  • fYear
    2011
  • fDate
    3-5 Sept. 2011
  • Firstpage
    968
  • Lastpage
    972
  • Abstract
    For the complexities of production and the limitations and lacks of methods for cost estimation of customized productions, a method for cost estimation based on Case-Based Reasoning was put forward in the steel enterprises. The process flow of the steel productions was analyzed in order to determine every activity in manufacturing steel productions. The descriptive procedure for the cases and the structure of cases database were presented in detail. The algorithm for case retrieving, adapting and learning was presented. The scheme was illustrated and verified by practical applications.
  • Keywords
    case-based reasoning; costing; production engineering computing; steel industry; activity-based cost estimation; case-based reasoning; cases database; customized productions; manufacturing steel productions; steel enterprise; Cognition; Complexity theory; Estimation; Manufacturing processes; Smelting; Steel; Case retrieval; Case-Based Reasoning; Cost estimation; Steel enterprise;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management (IE&EM), 2011 IEEE 18Th International Conference on
  • Conference_Location
    Changchun
  • Print_ISBN
    978-1-61284-446-6
  • Type

    conf

  • DOI
    10.1109/ICIEEM.2011.6035317
  • Filename
    6035317