DocumentCode :
555673
Title :
Cuscore charts detecting spike signals in feedback control scheme
Author :
Ma, Yi-zhong ; Wu, Feng ; Liu, Li-ping
Author_Institution :
Sch. of Econ. & Manage., Nanjing Univ. of Sci. & Technol., Nanjing, China
Volume :
Part 2
fYear :
2011
fDate :
3-5 Sept. 2011
Firstpage :
1010
Lastpage :
1013
Abstract :
Integration of statistical process control (SPC) and engineering process control (EPC) is found widely recognition in reducing process variability. The focus in this work is providing a method for detecting spike signals in an industrial process under the feedback control scheme using Cuscore chart. First, relevant works and the Cuscore statistic are introduced, then the appropriate Cuscore statistic that can be used to identify spike signals hidden in an integrated control scheme is derived. And finally, the effectiveness of the Cuscore statistic to detect spike signals is illustrated by simulations.
Keywords :
control charts; feedback; statistical process control; Cuscore chart; Cuscore statistic; engineering process control; feedback control; industrial process; process variability; spike signal detection; statistical process control; Centralized control; Control charts; Equations; Mathematical model; Monitoring; Noise; Process control; Cuscore statistic; engineering process control; integration model; spike signals; statistical process control;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management (IE&EM), 2011 IEEE 18Th International Conference on
Conference_Location :
Changchun
Print_ISBN :
978-1-61284-446-6
Type :
conf
DOI :
10.1109/ICIEEM.2011.6035327
Filename :
6035327
Link To Document :
بازگشت