Title :
The application of six sigma methods in Packing Line Y of Company A
Author :
Shu, Jun-yi ; Liu, Liang
Author_Institution :
Univ. of Sci. & Technol. Beijing, Beijing, China
Abstract :
Facing the phenomena of high downtime and high outage rate, unstable OEE level of the equipment and unable to achieve the best level on Packing Line Y of Company A we use six sigma analysis tools for finding the various downtime reasons on Packing Line Y and then find out the key influence factors to OEE level, and present some improvement.
Keywords :
packaging; production equipment; six sigma (quality); OEE method; equipment downtime reasons; key influence factors; overall equipment effectiveness method; packing line; six sigma methods; Companies; Educational institutions; Manufacturing; Packaging; Preventive maintenance; Production; Six sigma; DMAIC model; Improvement; OEE method; Pareto diagram;
Conference_Titel :
Industrial Engineering and Engineering Management (IE&EM), 2011 IEEE 18Th International Conference on
Conference_Location :
Changchun
Print_ISBN :
978-1-61284-446-6
DOI :
10.1109/ICIEEM.2011.6035341