DocumentCode :
560224
Title :
Application of ABCM to Construction Project
Author :
Jianyun, Yang
Author_Institution :
Zhengzhou Inst. of Aeronaut. Ind. Manage., Zhengzhou, China
Volume :
1
fYear :
2011
fDate :
26-27 Nov. 2011
Firstpage :
205
Lastpage :
208
Abstract :
Construction project has long been suspected to fail to provide information. Incomplete information provided by cost management system has the potential to misdirect decision making by construction project manager. Construction project need a cost management system that can provide effective information about their project, markets, customers, and counterpart. Through comparison of activity-based cost management (ABCM) and traditional cost management, an ABCM model of construction project that integrate both traditional cost management and ABCM´s advantages was constructed. Because of lacking activity coding system and foundation database, the application of ABCM to construction project is not perfect. This paper not only provides an activity-based cost management model but also gives directions for Construction Company how to set up an unblocked, reliable information channel and how to collect material.
Keywords :
activity based costing; construction industry; decision making; information management; project management; ABCM system; activity based cost management system; construction projects; decision making; project information; Companies; Cost accounting; Databases; Encoding; Materials; Steel; Structural beams; ABCM; Construction Company; Construction project; cost forecast; cost plan;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Information Management, Innovation Management and Industrial Engineering (ICIII), 2011 International Conference on
Conference_Location :
Shenzhen
Print_ISBN :
978-1-61284-450-3
Type :
conf
DOI :
10.1109/ICIII.2011.54
Filename :
6114615
Link To Document :
بازگشت