• DocumentCode
    560250
  • Title

    A Framework for Culture Management in Sino-African International Construction Projects

  • Author

    Agnantounkpatin, Arnaud R. ; Zhang, Lian Ying

  • Author_Institution
    Sch. of Manage. & Econ., Tianjin Univ., Tianjin, China
  • Volume
    2
  • fYear
    2011
  • fDate
    26-27 Nov. 2011
  • Firstpage
    51
  • Lastpage
    54
  • Abstract
    The nature of the product and the parties involved in a construction project depend on time (T), site conditions(Sc), user needs(Un) and economic health(Eh) and delays usually cost more than planned. In international construction projects, one of biggest factors of delays (even stoppage of projects) is the cultural factor(Cf). Construction contractors have until now put very few attentions into culture management and its impact on projects. It´s known that Chinese culture is very special and very different from other countries´. While African countries culture especially working culture is influenced by western countries culture (because of colonization), it remains very different and unique. Hence Sino-African ICPs are facing many problems due to the extreme difference of culture between those two parts. This paper presents the direct impacts of difference of culture in Sino-African international construction projects by presenting a literature review on the differences between the Chinese and African construction cultures from the design phase(design culture) to construction phase (organizational culture). Based on interviews and previous research works we present a Management Framework(MF) for the culture management during Sino-African International Construction Projects.
  • Keywords
    construction industry; cultural aspects; organisational aspects; project management; African countries culture; Chinese culture; Sino-African international construction projects; construction contractors; cultural factor; culture management; economic health; organizational culture; site conditions; user needs; western countries culture; Africa; Companies; Cultural differences; Delay; Educational institutions; Interviews; Project management; Culture management; Management Framework (MF); Sino-African ICPs;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information Management, Innovation Management and Industrial Engineering (ICIII), 2011 International Conference on
  • Conference_Location
    Shenzhen
  • Print_ISBN
    978-1-61284-450-3
  • Type

    conf

  • DOI
    10.1109/ICIII.2011.160
  • Filename
    6114654