DocumentCode :
560647
Title :
A heuristic model for scheduling wind turbines
Author :
Hu, Man ; Song, Zhe
Author_Institution :
Sch. of Bus., Nanjing Univ., Nanjing, China
Volume :
1
fYear :
2011
fDate :
8-9 Sept. 2011
Firstpage :
200
Lastpage :
204
Abstract :
Due to variability of electricity price, grid demand and wind speed as well as heterogeneity of wind turbines, operators of a wind farm encounter challenges of determining operational status of wind turbines (on/off) to achieve power generation objectives but minimize the total cost. A heuristic model that develops scheduling strategies of wind turbines for operators in a wind farm is discussed in this paper. A modified particle swarm optimization algorithm with small world network structure is introduced to solve the heuristic model. The computed scheduling strategies suggest the operational status of wind turbines over the pre-determined scheduling horizon that minimizes the total cost of a wind farm.
Keywords :
particle swarm optimisation; power generation scheduling; wind turbines; electricity price; grid demand; heuristic model; particle swarm optimization algorithm; power generation; wind farm; wind speed; wind turbines; Electricity; Job shop scheduling; Optimization; Wind farms; Wind speed; Wind turbines; optimization; particle swarm optimization; scheduling; small world; wind turbine;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Engineering and Automation Conference (PEAM), 2011 IEEE
Conference_Location :
Wuhan
Print_ISBN :
978-1-4244-9691-4
Type :
conf
DOI :
10.1109/PEAM.2011.6134835
Filename :
6134835
Link To Document :
بازگشت