DocumentCode :
560719
Title :
Notice of Retraction
Synchronization of islands: Criteria, procedures and technical requirements for synchronizing systems
Author :
Grzegorzyca, G.
Author_Institution :
Power Res. & Testing Co., Gliwice, Poland
Volume :
2
fYear :
2011
fDate :
8-9 Sept. 2011
Firstpage :
407
Lastpage :
412
Abstract :
Notice of Retraction

After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.

We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.

The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.

There are discussed some proposals concerning practical execution of island synchronizing and closing loops. Measuring criteria and connecting procedures of islands in normal state and during system failure are presented. Requirements for tools dedicated to monitor, control, visualize and register parameters during connecting operations are also discussed. In addition some measurements during events occurred in UCTE system are presented.
Keywords :
distributed power generation; synchronisation; UCTE system; connecting operations; island synchronization; island-closing loops; system failure; technical requirements; Generators; Integrated circuit interconnections; Substations; Switches; Synchronization;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Engineering and Automation Conference (PEAM), 2011 IEEE
Conference_Location :
Wuhan
Print_ISBN :
978-1-4244-9691-4
Type :
conf
DOI :
10.1109/PEAM.2011.6134971
Filename :
6134971
Link To Document :
بازگشت