Title :
Regulation of ancillary services with integrated GAS power plant in a hydro-thermal deretulated power system
Author :
Farook, S. ; Raju, P. Sangameswara
Author_Institution :
Coll. of Eng., S.V.U., Tirupathi, India
Abstract :
In a deregulated power system regulating the ancillary services is one of the most important issues. The present work focuses on regulating load frequency control ancillary service in a deregulated scenario with integration of potentially developing combined cycle gas fired power plants. A conventional Proportional Integral and derivative controller is used as a supplementary controller to optimize the regulation using Meta heuristic firefly algorithm. Using ITAE as performance criteria to be optimize, the PID controller parameters: proportional (Kp), Integral (Ki), and Derivative (Kd) gains are optimized using the proposed Algorithm by considering the possible feasible bilateral contracts between the various DISCOs and GENCOs of the deregulated power system. The proposed control strategy is investigated on a two-area interconnected power system consisting of Hydro-Thermal unit in the area-I and Thermal-Gas unit in area-II. The main objective of optimization is to improve the dynamics of LFC such as improving of the transient response of frequency and tie-line power oscillations and to optimizing the Power generated by various GENCOs according to the scheduled bilateral contracts. The simulation results show the PID controller tuned by Firefly algorithm (FA) exhibits a considerable improvement in dynamic performance of LFC.
Keywords :
combined cycle power stations; contracts; frequency control; frequency response; hydrothermal power systems; load regulation; optimisation; power generation control; power generation scheduling; power markets; power system interconnection; power system transient stability; three-term control; transient response; DISCO; GENCO; Hydro-Thermal unit; ITAE; LFC dynamics; PID controller parameter; Thermal-Gas unit; bilateral contract scheduling; combined cycle gas fired power plants; conventional proportional integral-derivative controller; derivative gain; frequency transient response; hydrothermal deregulated power system; integral gain; integrated GAS power plant; load frequency control ancillary service regulation; meta heuristic firefly algorithm; proportional gain; tie-line power oscillations; two-area interconnected power system; Contracts; Fires; Frequency control; Heuristic algorithms; Power generation; Power system dynamics; Bilateral contracts;
Conference_Titel :
Advances in Power Conversion and Energy Technologies (APCET), 2012 International Conference on
Conference_Location :
Mylavaram, Andhra Pradesh
Print_ISBN :
978-1-4673-2042-9
DOI :
10.1109/APCET.2012.6302044