    Improved fuzzy critical chain buffer setting method

  • Author

    Ma Guo-Feng ; Jiang Yong-Bin

  • Author_Institution
    Sch. of Econ. & Manage., Tongji Univ., Shanghai, China
  • Volume
    1
  • fYear
    2012
  • fDate
    20-21 Oct. 2012
  • Firstpage
    240
  • Lastpage
    243
  • Abstract
    The Critical chain method provides a very good tool for the management of project uncertain factors. In the critical chain Safety Time of single-unit activity is stripped and the uncertainty fluctuation of activities duration is absorbed through the setting buffer. Simple trapezoidal fuzzy number is used to describe the uncertainty of the project activities duration from the uncertainty perspective. And the fuzzy durations of activities are transformed into deterministic duration through period consistency index method. Then buffer setting method is improved and the feeding buffer size is revised. Improved buffer setting method considers the characteristics of the project network structure, which make the buffer setting method more scientific and reasonable.
  • Keywords
    critical path analysis; fuzzy set theory; project management; activities duration uncertainty fluctuation; critical chain safety time; deterministic duration; feeding buffer size; fuzzy activity duration; fuzzy critical chain buffer setting method; period consistency index method; project network structure; project uncertain factor management; single-unit activity; trapezoidal fuzzy number; Educational institutions; Estimation; Indexes; Planning; Project management; Safety; Uncertainty; Buffer setting; Consistency Index Method; Critical Chain; Fuzzy Duration;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information Management, Innovation Management and Industrial Engineering (ICIII), 2012 International Conference on
  • Conference_Location
    Sanya
  • Print_ISBN
    978-1-4673-1932-4
  • Type

    conf

  • DOI
    10.1109/ICIII.2012.6339643
  • Filename
    6339643