  • Title

    Economic and risk evaluation on large hydropower station delivery engineering project in Southern China

  • Author

    Liu, Shan

  • Author_Institution
    Econ. & Manage. Sch., Wuhan Univ., Wuhan, China
  • Volume
    2
  • fYear
    2012
  • fDate
    20-21 Oct. 2012
  • Firstpage
    106
  • Lastpage
    109
  • Abstract
    How to evaluate the economic and risk level of large hydropower station delivery project is an important area in research and practice, since such project will increase quickly in Southern China. In this paper, the method for evaluating the economic benefit of such project was put forward by showing a case. Moreover, according to the characteristics of water power delivery, the method for evaluating the risk, which may have large impact on economic benefit, was raised. The results showed that grid-connection volume, operation cost are important risk factors. Finally, risk mitigation strategies were raised to reduce the project risk.
  • Keywords
    hydroelectric power stations; power system management; risk management; Southern China; economic benefit; economic evaluation; grid connection volume; hydropower station delivery engineering project; operation cost; project risk; risk evaluation; risk mitigation; water power delivery; Economics; Indexes; Investments; Power system dynamics; Production; Sensitivity; Technological innovation; Hydropower station; delivery project; economic analysis; risk evaluation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information Management, Innovation Management and Industrial Engineering (ICIII), 2012 International Conference on
  • Conference_Location
    Sanya
  • Print_ISBN
    978-1-4673-1932-4
  • Type

    conf

  • DOI
    10.1109/ICIII.2012.6339789
  • Filename
    6339789