Comparison study of various factors affecting end-to-end delay in IEC 61850 substation communications using OPNET
Author :
Das, Narottam ; Ma, Wu ; Islam, Syed
Author_Institution :
Dept. of Electr. & Comput. Eng., Curtin Univ., Perth, WA, Australia
fYear :
2012
fDate :
26-29 Sept. 2012
Firstpage :
1
Lastpage :
5
Abstract :
The use of IEC 61850 communication protocol has more widely applied in electrical engineering, it presents new challenges to real-time performance simulation and testing of protective relays. In this paper, the OPNET Modeler simulation software has been used for the modeling of intelligent electronic device (IED) in substation level network. Based on simulations, different types of data stream have been discussed, such as, periodic data stream, random data stream and burst data steam. The specific studies using these models to construct substation automation system (SAS) network on OPNET modeler was made to reveal the influence of each factor to the real-time performance, which is also included in this report.
Keywords :
power system simulation; protocols; relay protection; substation automation; IEC 61850 substation communication protocol; IED; OPNET Modeler simulation software; SAS network; burst data steam; electrical engineering; end-to-end delay; intelligent electronic device; periodic data stream; protective relay testing; random data stream; real-time performance simulation; substation automation system network; Communication networks; Data models; Delay; IEC standards; Protocols; Real-time systems; Substations; IEC 61850; OPNET Modeler; Power system simulation; Real-time; Transmission delay; substation automation system (SAS);
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Universities Power Engineering Conference (AUPEC), 2012 22nd Australasian
Conference_Location :
Bali
Print_ISBN :
978-1-4673-2933-0
Type :
conf
Filename :
6360225
Link To Document :
بازگشت