DocumentCode
581161
Title
A new control method in Phase-Shifted Full-bridge converter for reduced power consumption under light load conditions
Author
Kim, Duk-You ; Kim, Chong-Eun ; Moon, Gun-Woo
Author_Institution
Dept. of Electr. Eng., KAIST, Daejeon, South Korea
fYear
2012
fDate
25-28 Oct. 2012
Firstpage
86
Lastpage
91
Abstract
This paper proposes a new control method in Phase-Shifted Full-bridge converter for the server power supply, which is wide delay time of lagging-leg switches under the light load conditions. By widening the delay time, the switching is achieved at the lower drain-source voltage and switching loss can be reduced under the light load conditions. The voltage stress of synchronous rectifier switches is also reduced. Without additional power devices and side-effects at heavy load condition, the higher efficiency under the light load conditions can be obtained. The analysis and experimental results are presented in the paper to confirm the validity of this study.
Keywords
computer power supplies; delays; phase shifters; power consumption; rectifiers; switched mode power supplies; switching convertors; delay time; lagging leg switch; light load condition; phase shifted full bridge converter; reduced power consumption; server power supply; switching converter; switching loss; synchronous rectifier switch; voltage stress; Delay; Gold; Silver; Switches;
fLanguage
English
Publisher
ieee
Conference_Titel
IECON 2012 - 38th Annual Conference on IEEE Industrial Electronics Society
Conference_Location
Montreal, QC
ISSN
1553-572X
Print_ISBN
978-1-4673-2419-9
Electronic_ISBN
1553-572X
Type
conf
DOI
10.1109/IECON.2012.6388826
Filename
6388826
Link To Document