DocumentCode
581938
Title
Project characteristics based buffer sizing to critical chain scheduling
Author
Ze, Guo ; Zheng, Zheng ; Lin Shu Min ; Yang Rui Feng
Author_Institution
Sch. of Autom. Sci. & Electr. Eng., Beihang Univ., Beijing, China
fYear
2012
fDate
25-27 July 2012
Firstpage
2400
Lastpage
2405
Abstract
The robustness of projects, which is strongly influenced by network structures and resource requirements is easy to be overlooked by traditional critical chain scheduling/buffer management approaches. In their approaches, usually task duration is the only factor considered. This paper analyzes the effect of order strength and resource constrainedness to the buffer size, and then proposes an improved buffer sizing strategy. Experimental results show that this strategy can effectively increase the proportion of buffer consumed, decrease the deliver time of project, and assure a satisfying project makespan.
Keywords
network theory (graphs); project management; scheduling; sizing (materials processing); supply chain management; buffer management approaches; critical chain scheduling; network structures; order strength; project characteristics based buffer sizing strategy; project makespan; project robustness; resource constrainedness; resource requirements; Abstracts; Aerospace control; Automation; Educational institutions; Electrical engineering; Electronic mail; Laboratories; Buffer Modify Strategy; Critical Chain; Order Strength; Resource Constrainedness;
fLanguage
English
Publisher
ieee
Conference_Titel
Control Conference (CCC), 2012 31st Chinese
Conference_Location
Hefei
ISSN
1934-1768
Print_ISBN
978-1-4673-2581-3
Type
conf
Filename
6390327
Link To Document