• DocumentCode
    582864
  • Title

    On time model of auto verification system of low-voltage current transformer

  • Author

    Jing, Zhang ; Jie, Dai ; Jiang-Wen, Xiao

  • Author_Institution
    Dept. of Control Sci. & Eng., Huazhong Univ. of Sci. & Technol., Wuhan, China
  • fYear
    2012
  • fDate
    25-27 July 2012
  • Firstpage
    7647
  • Lastpage
    7651
  • Abstract
    In the power system, current transformer is indispensable in power station and power substation. In China there is even a professional department to verify it. In this paper, the procedure of the auto verification system of low-voltage current transformer is discussed based on an actual project application. The time distribution on assembly line for a single current transformer, a whole case and several boxes is also analyzed respectively. Finally the time model of auto verification system is developed, and a basis and algorithm for system optimization and calculating efficiency is offered.
  • Keywords
    assembling; current transformers; power stations; substations; assembly line; autoverification system; low-voltage current transformer; power station; power substation; power system; single current transformer; system optimization; Abstracts; Assembly; Current transformers; Educational institutions; Electronic mail; Radiofrequency identification; Auto Verification System; Low-voltage Current Transformer; Time Model of Assembly Line;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Control Conference (CCC), 2012 31st Chinese
  • Conference_Location
    Hefei
  • ISSN
    1934-1768
  • Print_ISBN
    978-1-4673-2581-3
  • Type

    conf

  • Filename
    6391298