Optimal operation scheduling of pumped storage hydro power plant using efficient optimization algorithm
Author :
Aihara, Ryo ; Yokoyama, Akihisa ; Nomiyama, F. ; Kihara, H.
Author_Institution :
Dept. of Electr. Eng., Univ. of Tokyo, Tokyo, Japan
fYear :
2012
fDate :
Oct. 30 2012-Nov. 2 2012
Firstpage :
1
Lastpage :
6
Abstract :
Photovoltaic (PV) generations are expected to have an important role in the near future. However, the power output from the PV is random and intermittent in nature. Therefore, the PV generation poses many challenges to the power system operation. To evaluate impacts of the behavior of PV on the power system operation, we have so far proposed effective use of pumped storage hydro power plant (PSHPP). In the previous research, it takes too much computation time to obtain an optimal scheduling of PHSPP. In this paper, a new optimal scheduling method using efficient economic load dispatch (ELD) calculation and using optimal solutions stored in the database is presented.
Keywords :
optimisation; photovoltaic power systems; pumped-storage power stations; scheduling; economic load dispatch calculation; optimal operation scheduling; optimal scheduling; optimization algorithm; photovoltaic generations; pumped storage hydro power plant; Computational modeling; Generators; Springs; Optimal Operation Scheduling; Photovoltaic Generations; Pumped Storage Hydro Power Plant; Tabu Search;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power System Technology (POWERCON), 2012 IEEE International Conference on
Conference_Location :
Auckland
Print_ISBN :
978-1-4673-2868-5
Type :
conf
DOI :
10.1109/PowerCon.2012.6401455
Filename :
6401455
Link To Document :
بازگشت