DocumentCode :
597450
Title :
Scheduling jobs with time constraints between consecutive process steps in semiconductor manufacturing
Author :
Klemmt, Andreas ; Monch, Lars
Author_Institution :
Infineon Technol. Dresden GmbH, Dresden, Germany
fYear :
2012
fDate :
9-12 Dec. 2012
Firstpage :
1
Lastpage :
10
Abstract :
In this paper, we consider flow shop scheduling problems for jobs with time constraints between consecutive process steps. We start by analyzing different types of time constraints that arise in semiconductor wafer fabrication facilities. A simple heuristic that sequentially schedules the jobs in a list scheduling manner is proposed. Moreover, a decomposition approach based on mixed integer programming is developed. The two approaches are compared by means of randomly generated problem instances.
Keywords :
flow shop scheduling; integer programming; job shop scheduling; production facilities; semiconductor device manufacture; decomposition approach; flow shop scheduling problem; job scheduling; list scheduling; mixed integer programming; semiconductor manufacturing; semiconductor wafer fabrication facilities; time constraint; Dispatching; Job shop scheduling; Mathematical model; Processor scheduling; Schedules; Time factors;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Simulation Conference (WSC), Proceedings of the 2012 Winter
Conference_Location :
Berlin
ISSN :
0891-7736
Print_ISBN :
978-1-4673-4779-2
Electronic_ISBN :
0891-7736
Type :
conf
DOI :
10.1109/WSC.2012.6465235
Filename :
6465235
Link To Document :
بازگشت