DocumentCode :
597474
Title :
Using iterative simulation to incorporate load-dependent lead times in master planning heuristics
Author :
Ponsignon, Thomas ; Monch, Lars
Author_Institution :
Supply Chain Manage., Infineon Technol. AG, Neubiberg, Germany
fYear :
2012
fDate :
9-12 Dec. 2012
Firstpage :
1
Lastpage :
12
Abstract :
In this paper, we consider heuristics for master planning in semiconductor manufacturing. While lead times are typically assumed as fixed in production planning, we use iterative simulation to take load-dependent lead times into account. An AutoSched AP simulation model of a semiconductor supply chain is used for implementing the scheme. Simulation results show that the iterative scheme converges fast and leads to less variable, more profitable production plans compared to planes obtained by the fixed lead time approach.
Keywords :
production planning; semiconductor industry; semiconductor technology; AutoSched AP simulation model; iterative simulation; load dependent lead times; master planning heuristics; production planning; semiconductor manufacturing; semiconductor supply chain; Computational modeling; Iterative methods; Load modeling; Planning; Production planning; Semiconductor device modeling;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Simulation Conference (WSC), Proceedings of the 2012 Winter
Conference_Location :
Berlin
ISSN :
0891-7736
Print_ISBN :
978-1-4673-4779-2
Electronic_ISBN :
0891-7736
Type :
conf
DOI :
10.1109/WSC.2012.6465279
Filename :
6465279
Link To Document :
بازگشت