DocumentCode
597474
Title
Using iterative simulation to incorporate load-dependent lead times in master planning heuristics
Author
Ponsignon, Thomas ; Monch, Lars
Author_Institution
Supply Chain Manage., Infineon Technol. AG, Neubiberg, Germany
fYear
2012
fDate
9-12 Dec. 2012
Firstpage
1
Lastpage
12
Abstract
In this paper, we consider heuristics for master planning in semiconductor manufacturing. While lead times are typically assumed as fixed in production planning, we use iterative simulation to take load-dependent lead times into account. An AutoSched AP simulation model of a semiconductor supply chain is used for implementing the scheme. Simulation results show that the iterative scheme converges fast and leads to less variable, more profitable production plans compared to planes obtained by the fixed lead time approach.
Keywords
production planning; semiconductor industry; semiconductor technology; AutoSched AP simulation model; iterative simulation; load dependent lead times; master planning heuristics; production planning; semiconductor manufacturing; semiconductor supply chain; Computational modeling; Iterative methods; Load modeling; Planning; Production planning; Semiconductor device modeling;
fLanguage
English
Publisher
ieee
Conference_Titel
Simulation Conference (WSC), Proceedings of the 2012 Winter
Conference_Location
Berlin
ISSN
0891-7736
Print_ISBN
978-1-4673-4779-2
Electronic_ISBN
0891-7736
Type
conf
DOI
10.1109/WSC.2012.6465279
Filename
6465279
Link To Document