• DocumentCode
    597474
  • Title

    Using iterative simulation to incorporate load-dependent lead times in master planning heuristics

  • Author

    Ponsignon, Thomas ; Monch, Lars

  • Author_Institution
    Supply Chain Manage., Infineon Technol. AG, Neubiberg, Germany
  • fYear
    2012
  • fDate
    9-12 Dec. 2012
  • Firstpage
    1
  • Lastpage
    12
  • Abstract
    In this paper, we consider heuristics for master planning in semiconductor manufacturing. While lead times are typically assumed as fixed in production planning, we use iterative simulation to take load-dependent lead times into account. An AutoSched AP simulation model of a semiconductor supply chain is used for implementing the scheme. Simulation results show that the iterative scheme converges fast and leads to less variable, more profitable production plans compared to planes obtained by the fixed lead time approach.
  • Keywords
    production planning; semiconductor industry; semiconductor technology; AutoSched AP simulation model; iterative simulation; load dependent lead times; master planning heuristics; production planning; semiconductor manufacturing; semiconductor supply chain; Computational modeling; Iterative methods; Load modeling; Planning; Production planning; Semiconductor device modeling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Simulation Conference (WSC), Proceedings of the 2012 Winter
  • Conference_Location
    Berlin
  • ISSN
    0891-7736
  • Print_ISBN
    978-1-4673-4779-2
  • Electronic_ISBN
    0891-7736
  • Type

    conf

  • DOI
    10.1109/WSC.2012.6465279
  • Filename
    6465279