Title
A proposal on new scheduling of turbine discharge at Kaptai hydro-electric power plant to avoid the wastage of water due to overflow in the dam
Author
Chowdhury, M.A.M. ; Rahim, M. Abdul
Author_Institution
Electr. & Electron. Dept., Bangladesh Univ. of Eng. & Technol., Dhaka, Bangladesh
fYear
2012
fDate
20-22 Dec. 2012
Firstpage
758
Lastpage
762
Abstract
Hydro energy is one of the most significant sources of energy of Bangladesh. Kaptai hydro electric power plant is the only major power plant using water as source of electricity production. During the flood or heavy rainfall, a huge amount of water is wasted without production of electricity because water level of Kaptai dam crosses maximum limit which is known as overflow. This paper aims at using this water to produce electricity instead of just wasting it using existing generators. Calculations have been done for reducing water level at Kaptai dam during flood or heavy rainfall so that overflow doesn´t occur. This paper is proposing a new routine for the amount of used turbine discharge water in different months considering the net head of water. As a result, overall electricity production will increase. The output of the calculations on water level is also shown in the graphs.
Keywords
dams; hydraulic turbines; hydroelectric power stations; power generation scheduling; rain; Bangladesh; Kaptai dam overflow; Kaptai hydroelectric power plant; electricity production; heavy rainfall; hydroenergy; turbine discharge scheduling; water level reduction; water wastage avoidance; Electricity; Power systems; Production; Reservoirs; Turbines; Best use of available water; Kaptai hydro-electric power plant; Reduction of wastage of water; Spillway discharge;
fLanguage
English
Publisher
ieee
Conference_Titel
Electrical & Computer Engineering (ICECE), 2012 7th International Conference on
Conference_Location
Dhaka
Print_ISBN
978-1-4673-1434-3
Type
conf
DOI
10.1109/ICECE.2012.6471661
Filename
6471661
Link To Document