• DocumentCode
    6025
  • Title

    Development of Performance-Based Two-Part Regulating Reserve Compensation on MISO Energy and Ancillary Service Market

  • Author

    Yonghong Chen ; Leonard, Ryan ; Keyser, Marc ; Gardner, Joe

  • Author_Institution
    MISO, Carmel, IN, USA
  • Volume
    30
  • Issue
    1
  • fYear
    2015
  • fDate
    Jan. 2015
  • Firstpage
    142
  • Lastpage
    155
  • Abstract
    FERC Order 755 requires each RTO/ISO to use market-based mechanisms to select and compensate frequency regulation resources based on a two-part payment methodology, i.e., a capacity payment to keep the capacity in reserve and a performance payment to reflect the amount of work each resource performs in real-time in response to the system operator´s dispatch signal. This paper discusses how MISO enhanced its market rules to implement a market-based regulation performance payment. The market enhancement includes four key areas: quantifying the movement of regulation, modifications to the market clearing processes, performance accuracy measurement, and performance-based two-part regulation compensation.
  • Keywords
    frequency control; power generation dispatch; power markets; FERC Order 755; MISO; RTO; capacity payment; dispatch signal; frequency regulation resources; market clearing processes; market enhancement; market rules; market-based mechanisms; market-based regulation performance payment; performance accuracy measurement; performance-based two-part regulation compensation; system operator; two-part payment methodology; Accuracy; Automatic generation control; Frequency control; Proposals; Real-time systems; Software; Spinning; Ancillary services; co-optimization; dispatch and scheduling; locational marginal price; market clearing price; market design; reserve; system reliability;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/TPWRS.2014.2320519
  • Filename
    6815753