Research on the operating process of DC De-icer and its De-icing efficiency in China Southern Power Grid
Author
Yanzhou Chen ; Qi Wang ; Baoquan Gu ; Yanlei Cai ; Fushuan Wen
Author_Institution
Maintenance & Test Center, CSG EHV Power Transm. Co., Guangzhou, China
fYear
2012
fDate
12-14 Dec. 2012
Firstpage
583
Lastpage
588
Abstract
The China Southern Power Grid (CSG) has installed 6 sets of DC-deicer on its backbone transmission grid since the ice disaster in 2008, among which the DC-deicer in Gaopo substation of Gao-Zhao ±500kV DC transmission lines is the first OPGW deicer in CSG. Most of the existing DC-deicing research work concerns on the analyzing of transmission lines without considering the installation of de-icing switches. However, the icing problem of overhead ground lines has become the secondary influencing factor in the causation of power system fault during winter. Given this background, the general situation of the 6 sets of DC de-icer is presented and the de-icing operating process and its efficiency after the installation of de-icing switches are studied. Finally, suggestions are given on basis of the research.
Keywords
de-icing; disasters; power grids; power overhead lines; power transmission faults; substation protection; switches; CSG; China Southern power grid; DC deicing efficiency; DC transmission line; Gaopo substation; OPGW deicer; backbone transmission grid; deicing switch; ice disaster; icing problem; overhead ground line; power system fault; winter; DC de-icer; OPGW; de-icing operating process; ice-accumulation detecting andpre-alarming system;
fLanguage
English
Publisher
ieee
Conference_Titel
IPEC, 2012 Conference on Power & Energy
Conference_Location
Ho Chi Minh City
Type
conf
DOI
10.1109/ASSCC.2012.6523333
Filename
6523333
Link To Document