DocumentCode
605391
Title
A solution to unit commitment problem using Invasive Weed Optimization algorithm
Author
Saravanan, B. ; Vasudevan, E.R. ; Kothari, D.P.
Author_Institution
Vellore Inst. of Technol. Univ., Vellore, India
fYear
2013
fDate
6-8 Feb. 2013
Firstpage
386
Lastpage
393
Abstract
This paper proposes a new solution to effectively determine Unit Commitment and generation cost (UC) using the technique of Invasive Weed Optimization (IWO). The existing technique distributes the load demand among all the generating units. The method proposed here utilizes the output of Unit Commitment obtained through Lagrangian Relaxation (LR) method and calculates the required generation from only the plants that are ON discarding the OFF generator units and thereby giving a faster and more accurate response. Moreover, the results show the comparison between LR-Particle Swarm Optimization (PSO) and LR-IWO and proving that the cost of generation for an 8 hour 4 unit schedule is much lesser in case of IWO when compared to PSO.
Keywords
AC generators; costing; particle swarm optimisation; power generation dispatch; power generation economics; power generation scheduling; IWO; LR-IWO; LR-PSO; LR-particle swarm optimization; Lagrangian relaxation method; OFF generator units; UC; generating units; generation cost; invasive weed optimization algorithm; load demand; unit commitment problem; Economics; Educational institutions; Electronic mail; Fuels; Generators; Linear programming; Optimization; IWO; LR; economic dispatch; fuel cost; optimization; seeds;
fLanguage
English
Publisher
ieee
Conference_Titel
Power, Energy and Control (ICPEC), 2013 International Conference on
Conference_Location
Sri Rangalatchum Dindigul
Print_ISBN
978-1-4673-6027-2
Type
conf
DOI
10.1109/ICPEC.2013.6527687
Filename
6527687
Link To Document