• DocumentCode
    605421
  • Title

    A novel technique for optimal placement of PMU with measurement redundancy and reliability

  • Author

    Nafeena, R. ; Iruthayarajan, M.W.

  • Author_Institution
    Dept. Of Electr. & Electron. Eng., Anna Univ., Tirunelveli, India
  • fYear
    2013
  • fDate
    6-8 Feb. 2013
  • Firstpage
    546
  • Lastpage
    549
  • Abstract
    In this paper a heuristic based method is proposed. The power system is made completely observable by finding the strategic location for PMU´s. The simultaneous optimization of minimum number of PMU and maximization of measurement redundancy are performed. Measurement redundancy is performed based on the reliability TESt. Results for IEEE14-bus, 30-bus, and New England 39-bus system were simulated and compared with existing technique.
  • Keywords
    phasor measurement; redundancy; IEEE1 30-bus system; IEEE14-bus system; New England 39-bus system; PMU; heuristic based method; measurement redundancy; measurement reliability; optimal placement; phasor measuement unit; reliability test; Energy measurement; Observability; Phasor measurement units; Power measurement; Power systems; Redundancy; Measurement redundancy; heuristic; observability; optimal placement; phasor measurement unit; state estimation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power, Energy and Control (ICPEC), 2013 International Conference on
  • Conference_Location
    Sri Rangalatchum Dindigul
  • Print_ISBN
    978-1-4673-6027-2
  • Type

    conf

  • DOI
    10.1109/ICPEC.2013.6527717
  • Filename
    6527717