DocumentCode
606684
Title
Comparing socioeconomic & environmental impacts of building 2GW PV power plant in both sides of the Medeterranian
Author
Serag ElDin, Ahmed M. A. M. ; El-Mahgary, Y. ; Ali, A.H.H. ; Khairy, A.
Author_Institution
Dept. of Energy Resources Eng., Egypt-Japan Univ. of Sci. & Technol. (E-JUST), Alexandria, Egypt
fYear
2013
fDate
7-9 March 2013
Firstpage
331
Lastpage
336
Abstract
One of the most important and challenging task in the near future is the construction of large PV Power Plants (PP) on both sides of the Mediterranean. The Solar Power Plants built In Italy, Spain and Germany exceeds already several GW, whereas few projects are just starting on the other side of the Mediterranean (Tunisia, Algeria and Morocco). No projects exist yet in Egypt, although the solar radiation in Egypt is the highest in the world. The socioeconomic difficulties facing the construction of large PV plants in Europe will be briefly summarized. Using up-to-date available information we intend to argue in this paper that building, e.g., 2GW PV PP in Egypt and transmitting the electricity through HVDC submarine transmission lines to Europe could have more socioeconomic and environmental benefits than building it on the other side of the Mediterranean.
Keywords
building management systems; photovoltaic power systems; power generation economics; solar power stations; Egypt; Europe; HVDC submarine transmission lines; Medeterranian; PV PP; building PV power plant; environmental impacts; power 2 GW; socioeconomic impacts; solar radiation; Buildings; Electricity; Europe; HVDC transmission; Manufacturing; Power cables; Solar radiation; Environmental Impacts; Photovoltaic; Powerplants; Socioeconomic Impact;
fLanguage
English
Publisher
ieee
Conference_Titel
Renewable and Sustainable Energy Conference (IRSEC), 2013 International
Conference_Location
Ouarzazate
Print_ISBN
978-1-4673-6373-0
Type
conf
DOI
10.1109/IRSEC.2013.6529736
Filename
6529736
Link To Document