DocumentCode :
61069
Title :
An Integrated Framework for Risk Response Planning Under Resource Constraints in Large Engineering Projects
Author :
Chao Fang ; Marle, Franck ; Min Xie ; Zio, Enrico
Author_Institution :
Sch. of Econ. & Manage., Wuhan Univ., Wuhan, China
Volume :
60
Issue :
3
fYear :
2013
fDate :
Aug. 2013
Firstpage :
627
Lastpage :
639
Abstract :
Engineering project managers often face a challenge to allocate tight resources for managing interdependent risks. In this paper, a quantitative framework of analysis for supporting decision making in project risk response planning is developed and studied. The design structure matrix representation is used to capture risk interactions and build a risk propagation model for predicting the global mitigation effects of risk response actions. For exemplification, a genetic algorithm is used as a tool for choosing response actions and allocating budget reserves. An application to a real transportation construction project is also presented. Comparison with a sequential forward selection greedy algorithm shows the superiority of the genetic algorithm search for optimal solutions, and its flexibility for balancing mitigation effects and required budget.
Keywords :
budgeting; construction industry; decision making; genetic algorithms; greedy algorithms; planning; project management; resource allocation; risk management; transportation; budget reserve allocation; decision making; design structure matrix representation; engineering project managers; genetic algorithm search; global mitigation effects; interdependent risk management; optimal solutions; project risk response planning; quantitative framework; resource allocation; resource constraints; risk interactions; risk propagation model; risk response actions; sequential forward selection greedy algorithm; transportation construction project; Genetic algorithms; Greedy algorithms; Optimization; Planning; Project management; Risk management; Vectors; Complexity; design structure matrix (DSM); genetic algorithm (GA); project management; resource constraints; risk response planning;
fLanguage :
English
Journal_Title :
Engineering Management, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9391
Type :
jour
DOI :
10.1109/TEM.2013.2242078
Filename :
6464558
Link To Document :
بازگشت