DocumentCode :
613414
Title :
Overview and test results of modern pilot schemes for coordination of line distance protection relays
Author :
Bartosiewicz, E. ; Kowalik, R. ; Januszewski, M.
Author_Institution :
Inst. of Power Eng., Warsaw Univ. of Technol., Warsaw, Poland
fYear :
2013
fDate :
5-8 May 2013
Firstpage :
191
Lastpage :
196
Abstract :
The paper presents a short review of pilots schemes, which are available in modern line distance protection relays, and example results of common pilot schemes tests with the testing methods description. Some differences in implementations of selected pilot schemes have been shown for comparison reasons. Distance protection coordination functions have been tested for GE Multilin UR-series devices. Every type of available pilot scheme has been checked in synthetic test and during the real coordination between D60 and D90Plus devices. For POTT scheme, coordination between two L90 protections has been realized by a sort of available different telecommunication link types, for comparison reasons.
Keywords :
relay protection; testing; D60 device; D90Plus device; GE Multilin UR-series device; L90 protection; POTT scheme; distance protection coordination function; line distance protection relay coordination; pilot schemes test; testing method; Delays; Optical fiber networks; Performance evaluation; Power transmission lines; Protocols; Relays; Synchronous digital hierarchy; power system protection; substation protection; testing of power protection; transmission line;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Environment and Electrical Engineering (EEEIC), 2013 12th International Conference on
Conference_Location :
Wroclaw
Print_ISBN :
978-1-4673-3060-2
Type :
conf
DOI :
10.1109/EEEIC.2013.6549615
Filename :
6549615
Link To Document :
بازگشت