Evaluation of the requirements for battery energy storage system to postpone the investment of distribution system
Author
Wannasut, Chanikkanan ; Hongesombut, Komsan
Author_Institution
Dept. of Electr. Eng., Kasetsart Univ., Bangkok, Thailand
fYear
2013
fDate
15-17 May 2013
Firstpage
1
Lastpage
4
Abstract
This paper proposes the application of the battery energy storage system (BESS) to be installed in the distribution system for the purpose of postponing the investment of the distribution reinforcement in the short term power distribution planning. A study case of the distribution system including the photovoltaic system and the BESS obtained from the Provincial Electricity Authority (PEA) is used to evaluate the requirements of the BESS to be installed in the distribution system by considering four types of loads which are household, small enterprise, industry and other types. It reveals from the study that the installation of the BESS can effectively extend the time of the new distribution line construction.
Keywords
energy storage; installation; investment; photovoltaic power systems; power distribution planning; secondary cells; BESS; PEA; battery energy storage system; distribution line construction; distribution reinforcement; distribution system; installation; investment; photovoltaic system; provincial electricity authority; short term power distribution planning; Batteries; Electricity; Forecasting; Investment; Load modeling; Smart grids; Battery Energy Storage System; Distributed Generator; Smart Grid; Very Small Power Producer;
fLanguage
English
Publisher
ieee
Conference_Titel
Electrical Engineering/Electronics, Computer, Telecommunications and Information Technology (ECTI-CON), 2013 10th International Conference on
Conference_Location
Krabi
Print_ISBN
978-1-4799-0546-1
Type
conf
DOI
10.1109/ECTICon.2013.6559555
Filename
6559555
Link To Document