  • Title

    Evaluation of the requirements for battery energy storage system to postpone the investment of distribution system

  • Author

    Wannasut, Chanikkanan ; Hongesombut, Komsan

  • Author_Institution
    Dept. of Electr. Eng., Kasetsart Univ., Bangkok, Thailand
  • fYear
    2013
  • fDate
    15-17 May 2013
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    This paper proposes the application of the battery energy storage system (BESS) to be installed in the distribution system for the purpose of postponing the investment of the distribution reinforcement in the short term power distribution planning. A study case of the distribution system including the photovoltaic system and the BESS obtained from the Provincial Electricity Authority (PEA) is used to evaluate the requirements of the BESS to be installed in the distribution system by considering four types of loads which are household, small enterprise, industry and other types. It reveals from the study that the installation of the BESS can effectively extend the time of the new distribution line construction.
  • Keywords
    energy storage; installation; investment; photovoltaic power systems; power distribution planning; secondary cells; BESS; PEA; battery energy storage system; distribution line construction; distribution reinforcement; distribution system; installation; investment; photovoltaic system; provincial electricity authority; short term power distribution planning; Batteries; Electricity; Forecasting; Investment; Load modeling; Smart grids; Battery Energy Storage System; Distributed Generator; Smart Grid; Very Small Power Producer;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electrical Engineering/Electronics, Computer, Telecommunications and Information Technology (ECTI-CON), 2013 10th International Conference on
  • Conference_Location
    Krabi
  • Print_ISBN
    978-1-4799-0546-1
  • Type

    conf

  • DOI
    10.1109/ECTICon.2013.6559555
  • Filename
    6559555