Title :
Scheduling method for tire building based on heuristic algorithm
Author :
Shengping Yu ; Diancai Yang ; Kehui Zhu ; Shaowen Lu
Author_Institution :
Key Lab. of Process Ind. Autom. of Minist. of Educ., Northeastern Univ., Shenyang, China
fYear :
2013
fDate :
25-27 May 2013
Firstpage :
2380
Lastpage :
2383
Abstract :
There are more product specifications, great production and much equipment over the whole process of tire building. The actual complex scheduling problem of tire building is described in detail. To solve the complex multi-objective, large-scale production scheduling problem of tire building, a heuristic algorithm is proposed from the experience of the experts. The algorithm was tested by online data. Results show that the heuristic algorithm can quickly workout the optimal production scheduling of tire building, reduce the production cost, and improve productivity. The algorithm will lay the firm groundwork for application to production process in the future.
Keywords :
production management; scheduling; tyres; actual complex scheduling problem; heuristic algorithm; large-scale production scheduling problem; online data; optimal production scheduling; product specifications; production cost; production process; scheduling method; tire building; Buildings; Embryo; Job shop scheduling; Optimal scheduling; Tires; Heuristic Algorithm; Scheduling; Tire Building;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Control and Decision Conference (CCDC), 2013 25th Chinese
Conference_Location :
Guiyang
Print_ISBN :
978-1-4673-5533-9
Type :
conf
DOI :
10.1109/CCDC.2013.6561336
Filename :
6561336
Link To Document :
بازگشت