DocumentCode
621707
Title
IEC 61850 GOOSE transfer time measurement in development stage
Author
Gonzalez-Redondo, Miguel J. ; Moreno-Munoz, Antonio ; Pallares-Lopez, Victor ; Real-Calvo, Rafael J. ; Lopez, Manuel A.Ortiz ; Moreno-Garcia, Isabel M.
Author_Institution
Department of Computer Architecture, Electronics and Electronics Technology, University of Córdoba, Córdoba, Spain
fYear
2013
fDate
28-31 May 2013
Firstpage
1
Lastpage
6
Abstract
IEC 61850 is one of the crucial standards within the Smart Grid concept. For performance evaluation of communications between Intelligent Electronic Devices (IED) in Power Utility Automation, the standard defines the Transfer Time. Measurement of such parameter is not available for end user, but in development stage it is possible. Third party products can be used to reduce development time of IEC 61850 compliant devices. An initial performance evaluation of these products can be achieved through the measurement of the Transfer Time.
Keywords
IEC standards; Performance evaluation; Servers; Software; Substations; Time measurement; GOOSE; IEC 61850; Intelligent Electronic Device;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Electronics (ISIE), 2013 IEEE International Symposium on
Conference_Location
Taipei, Taiwan
ISSN
2163-5137
Print_ISBN
978-1-4673-5194-2
Type
conf
DOI
10.1109/ISIE.2013.6563762
Filename
6563762
Link To Document